Slow Day at North Judson 11-1-2014

 Well fall has arrived with a vengeance to NW Indiana Friday, snow, wind, cold, brutal
weather, just making it a horrid day. Saturday woke up to ice on the deck an a temp
of only 23 degrees. Slow going getting started.
 
Arrived at HVRM to see the Erie 310 an 2 cabooses on the main line in front of the
depot waiting for the next guest engineer. Had a total of 6 drivers today. This is the
final day of the year for this program. The 310 will be drained till its needed again.
 
Crossing Mulberry Street, I saw the crossing was replaced with asphalt. Thursday
it was tore out an North Judson donated asphalt to fix the crossing. Much better than
it was.
 
The work crew was in side the shop building working on the soon to be wood burner
stove. It was up righted an legs were being welded on the bottom, with more to
be done later on.
 
Steve Newland worked on downspouts on Grasselli tower.
 
Not much else to report. Board meeting next Saturday  morning at 8am in the depot.
 
Tom Travis