Wednesday, July 23, 2014

HVRM Payloader Garage 7-23-2014


I went down to North Judson this morning about 9:30am. Started in on taking
boards off the building. Took off some batten that will need replacing later
on. Cut a couple of long boards, one 4foot and one 3foot sections due to being
dry rotted an the rest of the board was fine near the top. Replaced those sections
with new wood. Lunch time, so got a Subway, an on way back down to Norwayne
and got 3 new boards. 2-1x12/10foot, 1-1x12x12foot, painted all 3 boards. Tried to
put up the 12 foot board, got it tacked up, but need some help later to get it right.
 
Worked till about 3pm, feet got tired. Wonderful day, nice breeze out of the north.
Had a couple of guys just looking around, might be back Friday to ride train.
Richard Warner over in shop welding some item. Couple parked their car
in front of depot, unloaded their bikes an did the trail.
 
 
Cleaned up the rotted wood, threw it in dumpster an headed home. Saw
a headlight down the CF&I down by Hanna, so headed that way, was 2 CSX
units with a ballast train dumping it along the right of way, with another diesel
on the west end. Lot of the cars were empty, but the cars towards the west
were still full.
 
Going back down tomorrow early to work on a couple of boards rotted at the
very bottom, hope to get those changed out and then start on getting the new
batten on. Have to leave by 1:30pm to get to La Porte by 3pm.
 
Friday is the train at 10am, then into scraping the west wall. The payloader needs
to be taken out to get at the north wall where it is smashed to fix things up, probably
on Saturday.
 
Weather is too good to pass up working, not the killer heat.
 
Tom

Monday, July 21, 2014

Lionel Train Collectors Ride HVRM 7-21-2014

Greetings,
 
Today was the Lionel Train Collectors Convention from INDY came up
this morning for a train ride to La Crosse. They arrived at 9:30am, all positions
were manned for tours, but long lines inside the depot for the restroom went
right up to 10am, the train loaded an departed almost on time. A very nice day,
in the mid 80's provided a nice ride. The group ate box lunches at the La Crosse
pavillion provided by a deli from INDY. Approx 60 people rode the train and
the depot gift shop did very well in sales. Lots of very friendly folks talking about
their train collections. I was carhost on the EJ&E transfer caboose with a wheel
chair. So a special stop at street crossing was made, so the lift was on solid
ground and they were able to get to the pavillion. Wyeing of the engine went
okay and soon coupled back up to the LIRR passenger car and back to load
passengers. Loaded up we headed back to HVRM. Time was allowed to visit
Grasselli tower, shop area, troop car exhibit and the C&O 2789 steam engine.
 
After the train was put on the caboose track, some switching occurred. The 
Whitcomb engine was pulled outside, other cars pulled out an put on the
museum main line. The tool car was put inside the building. Cory and Richard
started the UP tie tamper and moved it inside the shop area for some routine
maintenance. Easier to work on machines inside, than out in the open right
of way.
 
I broke for lunch and came back to work on the payloader garage. The picture
above was taken on Saturday. I took off one of the bottom boards, which just
crumpled into dust. Nailed a new board on and went around the the northside
in the shade. Took off the board that was broke by the payloaders forks some
time ago. I took it off carefully to use in other areas that need replacement.
I was attempting to pull out a nail, an broke the handle on my hammer. That
was it for the day. Will return with a bigger hammer tomorrow.
 
By 3pm everyone had left the museum for the day. Mark Knebel was at the
museum early to continue painting the HVRM depot. He got a lot done and
now only has the white trim to paint along the outer wall. Rain down spouts on
west and east side of the depot will be moved to run along the bottom of
the depot to the drains. It will make the building look better.
 
Lots of volunteers showed up to help out. Engineer was John LaOrange,
Conductor, Bob Albert. Doug Kosloske ran the operations portion. Car hosts
were, Randall Downs on open air car, Les Beckman on the Bessemer, Tom
Travis on the EJ&E, Joe Kingsbury on the LIRR coach. Loretta Kosloske
and Louise Kingsbury manned the depot an gift shop. Bob Jacqim was
crossing guard, Joe Baker, Matt Lasayko manned Grasselli tower an worked
on cleaning & lubing  interlocking rockers and levers. Thanks Matt. Harold Russell
helped on the open air car.
 
Friday the 25th will be another train ride for kids from North Judson and La Crosse.
Come on out an help out.
 
So it will be a busy week for everyone. Lots of things for everyone to work on,
just helping out in the depot, being a car host on the train, doing some painting.
 
Tom Travis

 
 

Sunday, July 20, 2014

Plenty of Work at HVRM 6-19-2014

Greetings to all,
 
Saturday was a great day for projects at HVRM. 8am general membership
meeting met inside the depot. A quorum was reached only at the last moment.
Various reports were given. The house next to Bing's is almost officially HVRM's,
Tom McKee's son has offered to tear it down free of charge an recycle the material.
They will be contacted an given a time limit to get it down. The garage was
discussed that it could be used as a storage shed for lawn mowers and other
items that are not used in the winter. The building will have to be inspected as
to what may need to be done with exterior and interior. No doors are on the
building at this time and some sort of doors would have to be built. The garage
would show up on properity taxes if left. Trees are dead an have to come down
or  will come down on their own in a storm. Joe Baker has acquired free of
charge 3 LED outside lamps and wil be installed today on the shop building.
The 3 lamps are of different sizes, but will be much easier to repair than the old
lighting on the building. Savings of $60 per year on electric should be saved.
Joe will seek grants from companies to acquire more lamps for around the
museum grounds. A tie order has been put in for 250. North Judson will
reimburse HVRM for 60 or so for crossing replancement in the near future.
The John Deere 4010 has developed a hydralic leak in the 3 point hitch system
an will require work this winter to be able to use the brush hog mower again.
Loretta noted that ridership is down on regular rides, but the LaCrosse trips
are up in numbers. I did not get the ridership for today.
 
Train today used EL 310 for diesel power. Last Sunday, work was performed on
the Interstate Steel 11 to trouble shoot the reverser problem. It was found that a
wire had come off the reverser mechanism an repaired. GE 11 is now back in
service. A number of people assisted with troubleshooting the problem. Last
Sunday, was guest engineer day for a number of people. A good program
for the museum and money income.
 
Engineers/Conductors-John DeGan/Doug Kosloske
Car attendants, Bill Dauber/Randall Downs/Tom Travis
Student conductor-Steve Hendrics
Depot- Loretta Kosloske
Kitchen Car-Margret Cook
Road crossing guard, Bob Jacqim, Les Beckman crossings to English Lake.

Richard Warner has donated an old John Deere weed sprayer. Sparky Beyers,
John LaOrange worked repairing they sprayer. Unknown what problems it may
have, but will be solved. A 50 foot hose with spray nozzle will be bought to be
used on the sprayer for areas that can't be reached by the sprayer. The sprayer
will be used to control the brush in the wye area that was recently cleared of trees
in the past years. Grassy area of the museum can now be sprayed quickly and
easily with the sprayer. It will help eliminate the use of sprayer backpacks and
the small pull around sprayers.
 
The tie replacement crew was busy getting ties replaced on the south side of 
IN 10 at the park area. 18 ties were replaced with what ties were on hand.
Spiking ties were difficult due to the dryness of the ties.  Cory Bennett, John
LaOrange, Dave Cook, Mark Knebel, Sparky Beyers were the crew today.
 
The payloader garage was worked on by Tom Travis, Fred Boyer, Steve Newland,
Les Beckman. I started on taking boards off the west side of the building that were
unsalvageable along with batten board. The corner boards also were dry rotted.
Fred and Steve cut notches in the wood for the rafters and corner boards. Steve
gave some tips on how to nail up the boards. Les gave assistance is nailing
boards up higher than I could reach. All the boards were primed before
nailing up. Jim Minnix cut boards to match the dimensions of the batten boards.
It won't be exactly the same designs as the old batten, but will be close. Old
batten boards were milled with a curved cut on the backside for boards that were
uneven and a cut made on each side of the board in a curved fashion. Old time
carpentry not found today on buildings. As old batten is taken off, it will be saved
for lengths that do no require a full 10 foot lenght, just replacement. 
 
Grasselli tower was worked on by Fred Boyer and Steve Newland. Fred painted
window sills.
 
The manlift is now back in operation. It still goes now slowly, but not as fast as
before. Some more parts and work is needed to rectify the problem, but is fully
operational.
 
Safety at the museum is paramont. A tourist museum experienced a death on
the properity by slipping under the wheels of a locomotive. Platforms are needed
to be watched carefully while trains are in motion. Watch for activity under
and around train cars. Climbing on equipment is strictly unauthorized. Discussion
for footwear around the museum should not be sandals or flip flop. A disclaimer
will be printed that wearing such footwear wil be at your own risk. Tour guides
in the shop area have been on going to groups, keeping the public aware of
hazards to unsuspecting visitors.
 
Monday, the Lionel Train Collector Convention from INDY will be coming by bus
to ride the train at 10am. We are expecting a large group for this event. July 25th
will also be another group riding the train at 10am. Come out an volunteer
if possible as carhosts, ticket takers, depot volunteers.
 
Everyone have a good week, drive safe, enjoy the nice weather we are having.
 
Hope to see everyone next Saturday.
 
Tom Travis HVRM 

Sunday, July 13, 2014

GE # 11 Update

GE #11 was repaired Sunday. Fully operational once again. A wire broke
off the reverser, shutting down the fault protection circuit. Matt Lasayko
assisted over the phone with the fix.
 
Thanks to all who worked on the problem.

Museum Push-Pull Train Operation 7-12-2014

Greetings,
 
Saturday started with a HVRM board meeting in the depot waiting room with
the hint of rain in the west sky. Items were discussed, painting of the HVRM
depot, building conditions, an scrap metal disposal. The  rain started shortly,
an most of members shut windows on vehicles. Mark Kniebel has started
repaint the HVRM depot this past week. Lots of problems painting due
to all the overhangs, decks and ramps around the depot, making it a time
consuming job setting up ladders an planks. Gutters and downspouts are
taken off to get to those areas of the depot outwer walls. Lots of small
details to work around. The scrap metal pile is getting bigger all the time,
but roll on-off dumpsters are not avail at this time from Richard, busy trash
hauling season. Buildings problems run from lighting issues to bad roofs,
payloader shed needing repainting and wood repairs. Joe Baker has come
up with the idea to replace all outside lighting with LED lighting to drop the
electric cost of almost 60 dollars a year on each bulb. LED programs and
grants thru electric companies will be looked into by Joe. Which the solar
panel project needs to get running, as the meter reading down on IN 10
keeps increasing every month. Elimination of electric meters and alternate
sources of engery need to get going to save on electric bills. The payloader
shed needs to be repainted with wood repair done to rotted areas of siding.
Over the years, the shed has only been painted maybe once since moving
it years ago and is beginning to show its age again. The wood batten is just
about wore out from the elements. Replacement is necessary. The motor car
shed roof needs a metal roof put on, as the shingles are just not lasting.
Ties have been ordered (250) with the city paying for approx 70 ties for crossing
replacement on county road north of the museum. Approx 55 ties are needed
for the IN 10 city park area. The ties are just at the point where running passenger
trains over the rail is in a grey area. Lots of tie work is needed on the museum
grounds, the main line thru the museum, and on sidings.
 
The manlift developed a problem last week when Mark was using it to fix outside
lighting, it would not move backwards. John LaOrange, Sparky, Richard Warner
worked on it, finding a valve was not working properly to move hydralic fluid.
Replacement parts are on order. John and Mark have been working on removing
the final burnt word inside the burnt out tool car. It is clear of all wood and now
some metal work around the floor area is needed to install a new deck. Maybe it
will get moved inside the building area soon for starting work on it. Lots of wood
needs to be installed to build up the floor, with tongue and grove put on for the
final layer.
 
The train crew consisted of John DeGan, engineer, Bob Albert Conductor, Joe
Kingsbury  as car host and passenger car maintainer. The crew could not get
the diesel engine started for a/c. The train was ready for departure and Richard
Warner came to the rescue and got it started for the crew. Randall was the
carhost for the open air car. Doug Kosloske was doing conductor classes inside
the kitchen car, with 3 trainees. Bob Barcus an Loretta Kosloske were depot
workers for the day. Close to 60 riders on all 3 trains today. Sunday is guest
enginneer program in the afternoon for 3 or 4 persons.
 
Grasselli tower workers, Fred Boyer, Steve Newland, Steve Hendrics were all busy
working on different areas of the tower. Radiators brackets are being installed and
the heavy radiators are being mounted along the walls. Fred worked on window
sills filling in cracks in the wood. Norwayne Lumber sent a paint rep down to look
at the peeling paint on the outside. Many ideas were banter about, but nothing
for a fix situation. Most likely leaking windows from rain is causing the problems
from the inside. Until all windows are replaced, repainting the outside will be
on hold. The upper level is progressing along nicely.
 
Les Beckman did some painting on the truck trailer plates, including the pins. Later
on I started on scraping paint off the payloader shed. Working from ground level,
reaching as high up as I could, tried to get the paint off. It came of fairly easy. Les
joined with paint removal, until we heard the Alco' bell from the shop area. 
 
Until the rain finally stopped after lunch, outside work was pretty much curtailed.
The GE #11 has worked well for the last couple of weeks as standin for Alco 310,
as it work was done on it, changed oil, engine work, brake work and was expected
to be operational for the upcoming special tourist trains this coming week.
The Alco would see a startup and testing as to how things were running. But
an emergency call from the tourist train arrived to Doug. The Alco was needed
to rescue the GE at La Crosse IN. The train had arrived at La Crosse, unloaded
passengers, then pulled to the west to have the engine run around the now open
wye. The #11 was at the first switch on the wye, and refused to reverse direction.
Lots of things were tried to fix the problem, but nothing worked. It just refused
to go either direction, so the Alco came to its rescue. The Alco tied on to the
LIRR coach, and then went down to rescue the GE. Passengers heard the
whistle of the Alco and quickly arrived for loading. The passengers all were
under the picnic canopy, and had use of restrooms inside the building.
The GE was sucessfully pulled back to North Judson and returned to the shop
building for repair. A late afternoon for everyone. Hopefully the problem will
not require a lot to fix.
 
Hopefully I will be able to help out more until school starts again August 17th.
A week in Norfolk VA for a week on the beach was very nice and relaxing. Lots
of interesting sights around Norfolk, the battleship USS Wisconsin is downtown
along with the the Norfolk Southern Museum close by. A very nice display of
artifacts and the entire line of NS Heritage diesel in HO scale on a display track.
A very interesting boat tour of the Navy ships and the docks around Norfolk. Lamberts
Points is a very interesting coal unloading facility from train to ships, lotsof coal
trains arrive to unload. Ships of all types are constantly entering an leaving
the harbor. One loading facility is for loading train locomotives onto ships for
export to foreign countries. Nothing was there at the time but 4 massive cranes
are located there for loading. I suspect that farm tractors going thru La Porte (John
Deere, Case, International) may be loaded from from the same facility. Lots of
ship drydocks had ships of all types out of the water. Was a very nice time for
myself, Maureen and Brianne. Intermodal containers are everywhere with massive
cranes. Those ships do not spend much time in port, strictly load and unload,
and they are off to other ports.
 
Good to be back after 3 weeks, Brianne had emergency gall bladder surgery
on July 7th, after waking up early on the 5th with a horrible stomach pain. Emergency
room decided after lots of scans, she had a inflamed gall bladder with lots of
gall stones. She is recovering nicely an should be back to normal by time school
starts in August
 
Take care everyone, have a good week. Check the HVRM web for trains coming
up during the week. Help is needed in almost every position, carhosts etc.
Loretta made the announcement the Lionel convention people are coming to
ride the train also. I'm sure they will be impressed with the G guage layout in
the museum.
 
Bob Jacqim recently had a stint put in to help with his health issues. Les was
flag bearer for the Mulberry crossing today.
 
Tom Travis
 
 
 
 
 

Wednesday, July 9, 2014

Chicago, West Pullman & Southern caboose #207

I contacted OmniTrax back in April to find out if the subject caboose still existed on the roster of
Chicago Rail Link, which now runs the old CWP (along with other trackage on the south side of
Chicago).  They advised me that the caboose was still in existance, and that I could make the
necessary arrangements with them, to photograph it.  Finally got around to doing that today. I've
included a couple of photos.
 
Les

Sunday, July 6, 2014

Fourth of July 2014 plus one, at HVRM

Greetings -

Hope that everyone had a wonderful Independence Day.  I had a late arrival at the museum due to cleanup from the get together at our house on the 4th, as we enjoyed the local Crown Point parade.  Hope other parades were as good as ours.

Bruce Emmons ran the gift shop and sold tickets today as Bob Barcus was a crewman on the trains, and Loretta and Doug were not in attendance.  Others on the train included Bjarne Henderson and Steve Henrichs.  John La Orange was engineer.

Mark Knebel, Cory Bennett and Dave Cook were "cleaning up" the right-of-way after spending their Fourth of July putting in ties at the switch out at the Main Street end of the property.

I painted the black lettering on the two concrete posts that were planted in the east flower bed last Saturday and then started removing loose paint from the "miniature" crossing bucks located at the crosswalk over the museums main line just to the west of the depot building.

Steve Henrichs and Steve Newland were talking outside of Grasselli Tower and I joined them and Fred Boyer up in the tower as we attempted to put in the first two long cast iron radiators along the south wall.  Those mama's are heavy, but we managed to lift and position the first, and then the second radiator on the supports that Steve Newland had custom built.  Steve then screwed both into place.  We then moved one of the radiators laying against the north wall on to temporary supports so that Steve can attach the radiator supports to the wall on that side.  So much for work on the tower this week!

Joe Baker reported that he had finished with the electrical work and that there is now power into the Troop Sleeper.  Great job Joe!  On another, non-museum item, but of interest locally, Joe reported that the move of the Grand Trunk Western depot in Valparaiso has begun.  The station has been moved and rotated 90 degrees and this coming week, Canadian National will take down flashers and gates so that Dillabaugh can move the building across the CN (ex-GTW) tracks.  After that is completed, the depot has to be turned another 90 degrees before moving into its final location.  Nice that the historic station has been saved.

In the afternoon, I painted the crossing bucks mentioned earlier and then put a coat of white paint on the two concrete posts in the east flower bed.  The photo included, shows the painted posts.  Quite a difference from last week.  By the way, the west flower bed can be seen in this photo off in the distance.  These two flower beds were put in to protect the wooden electric poles that visitors had a habit of backing in to and have done the job!  I then went over and touched up the black lettering on the crossing bucks.  I neglected to mention last week that the C&EI Property Line concrete post had been donated to HVRM by Charles Graves back around January of 2003.  So good that it has finally been put back in the ground! 

By this time, the "gandy dancers" were finished with their track work and Mark Knebel came over and attached the green shade he had repainted for the light over his office (photo attached).

The La Crosse train again ran in a push out/pull in configuration as the switch on the wye in La Crosse is apparently still not repaired so that we want to take our train though that trackwork.  

As the La Crosse train was arriving back in North Judson, I signed out and headed for home.

Enjoy the upcoming week everyone.


Les